Boker - Magnum Long Lead EDC Pocket Knife - 01SC080

Boker - Magnum Long Lead EDC Pocket Knife - 01SC080

Boker - Magnum Long Lead EDC Pocket Knife - 01SC080

Model Number: BOKE-01SC080

UPC: 788857750346

Boker
$55.97 Save $19.02
Re-stocked In 7-14 days*

Free Shipping Insurance

Free Delivery Over $149*

Some exclusions apply for remote regions and large items.

Extended Holiday Returns

Price Match Guarantee

Have questions? Your phone number is never stored.

Description

The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).

  • Slightly curved design
  • Slip-joint knife
  • Satin-finished 8Cr13MoV stainless steel blade
  • Opened by nail nick
  • Does not lock
  • Lightly contoured textured G10 handle scales
  • Fits comfortably in hand
  • With clip
                          Magnum

                          Magnum

                          Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable price-performance ratio. However, it is not only the price-sensitive knife enthusiast who is fascinated by the wide range of handle materials and practical blade steels. The concept takes place in Solingen, design, construction and finishing in Asia.

                          Specifications

                          Dimensions

                          Overall Length

                          7.24"

                          Blade Length

                          3.15"

                          Blade Thickness

                          0.11"

                          Product Weight

                          2.75oz

                          Details

                          Model

                          01SC080

                          Blade Material

                          8Cr13MoV

                          Handle Material

                          G10

                          Opener

                          Nail Nick

                          Opening

                          Manual

                          Lock Type

                          Slipjoint

                          Item Condition

                          New

                          Warranty / Certifications

                          Warranty

                          Lifetime

                          Reviews

                          Boker

                          Boker is shipped free across Canada on orders over $149. Boker Knives of Solingen, Germany has been producing knives and tools for over a century and today they are one of the foremost knife makers in the world.